Zur Kurzanzeige

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorCruzado Vélez, Héctor J.
dc.contributor.authorHuertas Morales, Adriel O.
dc.date.accessioned2024-03-19T13:07:28Z
dc.date.available2024-03-19T13:07:28Z
dc.date.issued2023
dc.identifier.citationHuertas Morales, A. O. (2023). Stamping Tooling Preventive Maintenance Project [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/2290
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractEaton Corporation's Electrical Sector, a global leader in power management solutions, faces a critical challenge in the Stamping Department's tooling equipment maintenance. The absence of a defined Preventive Maintenance Plan (PMP) has led to frequent breakdowns, increased downtime, and production inefficiencies. This paper presents a comprehensive approach to address this challenge, incorporating insights from literature on tools and dies preventive maintenance, Lean Six Sigma principles, and a detailed affinity analysis. The data-driven selection of cost-driver tools, their prioritization, and the development of a tailored PMP are discussed. The implementation of proactive measures, such as evaluating tooling cycles, generating maintenance tags, and designating dedicated personnel, contributes to improved efficiency. The future state envisions a preventive tooling handling process, reducing troubleshooting and downtime. Achievements include projected savings of $314k/year through improved Overall Equipment Efficiency (OEE), reduced support hours, and optimized Tool Room processes. The conclusions highlight the project's success and propose further enhancements to overall production. Key Terms ⎯ Affinity Analysis, Downtime, Non-Conformance, Overall Equipment Efficiency, Production Troubleshooting, Root Cause Analysis.en_US
dc.language.isoenen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofManagement;
dc.relation.ispartofseriesWinter-2023;
dc.relation.haspartSan Juanen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Researchen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Subject headings--Unassigneden_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Postersen_US
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate School--Master in Engineering Management degreeen_US
dc.titleStamping Tooling Preventive Maintenance Projecten_US
dc.typeArticleen_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Dateien zu dieser Ressource

Thumbnail
Thumbnail

Das Dokument erscheint in:

  • Management
    Articulos y Carteles de investigación (Poster): Ingeniería Gerencial (MEM) [San Juan, INTEC], Gerencia Ambiental (MEnvM) y Administración de Empresas (MBA)

Zur Kurzanzeige