Zur Kurzanzeige

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorFonseca, Wilfred
dc.contributor.authorEsquilin Santiago, Wilmari
dc.date.accessioned2020-07-21T11:37:05Z
dc.date.available2020-07-21T11:37:05Z
dc.date.issued2017
dc.identifier.citationEsquilin Santiago, W. (2017). QC downtime on work - orders of 100 pieces or less for packaging/boxing area [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/444
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractIn this investigation you will obtain information about a continuous improvement methods: the A3 Project application. This method follows the Plan Do Check Act (PDCA) cycle which will be conducted in the production lines for the first time in a high production medical device company. It will be focused on reducing the downtime generated in the packaging areas by the quality control (QC) inspectors in works of less than 100 pieces while allowing the inspections to be completed with a high quality. After several modifications with personnel from different areas such as: Planning Department, Quality Department and Packaging Department as well, was obtained an agreement in increasing amount of jobs and updated inspection sheets to standardized inspection processes facilitate inspectors tasks. Standardized inspection processes were also obtained. All the changes performed contributed notably to a significant reduction of downtime allowing the company to achieve a higher customer satisfaction and rating. Key Terms - A3 Project, DMAIC (DefineMeasure-Analyze-Improve-Control), Lean Six Sigma, PDCA (Plan-Do-Check-Act).en_US
dc.language.isoen_USen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofManufacturing Competitiveness;
dc.relation.ispartofseriesWinter-2017;
dc.relation.haspartSan Juanen_US
dc.subject.lcshSix sigma (Quality control standard)
dc.subject.lcshPackaging
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Research
dc.titleQC Downtime on Work - Orders of 100 Pieces or Less for Packaging/ Boxing Areaen_US
dc.typeArticleen_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Dateien zu dieser Ressource

Thumbnail

Das Dokument erscheint in:

Zur Kurzanzeige