ListarDesign Project Articles Master Degree por tema "Time management"
Mostrando ítems 1-20 de 49
-
Aero Repairs Documentation Cycle Time Reduction By Lean Application
(Polytechnic University of Puerto Rico, 2014)In our daily life and world, with a diversity of industries and services, from health to manufacturing, all kind of products; many of them care apply Lean concepts or tools to perform important improvements to their ... -
Analytical Method Technology Transfer From Quality Control Laboratory To Manufacture Area
(Polytechnic University of Puerto Rico, 2021)The project was developed with the intent to document the analytical transfer method to reduce in-process concentration testing cycle time. A reduction of up to 50% turnaround time (TAT) downtime was achieved. Waste reduction ... -
Application of Lean Manufacturing and Lean Six Sigma Tools to Improve Back to Back Activities in the Compression Process
(Polytechnic University of Puerto Rico, 2019)A recent opportunity regarding a product ramp up in the production schedule due to a potential product transfer requires the manufacturing area to look for creative ways to improve in order to comply with expected ... -
Audit Process Optimization in the Manufacturing Area
(Polytechnic University of Puerto Rico, 2021)This project was developed to demonstrate a viable audit process optimization in the manufacturing area. The AbbVie site ubicated in Barceloneta, Puerto Rico,started with only one product back in ... -
Changeover Reduction Time by Adjusting the Cleaning Critical Parameters in Automated CIP Systems
(Polytechnic University of Puerto Rico, 2018)Clean-In-Place (CIP) is a widely use process to clean biotechnology vessels contact surfaces. CIP is an automated cleaning method that involve minimum to no equipment disassembling thereby reducing labor and time ... -
¿Cómo se puede mejorar el sistema de calidad y seguimiento de un producto a nivel corporativo?
(Polytechnic University of Puerto Rico, 2022)El sistema de calidad en todos los ámbitos laborales es muy necesario ya que las compañías pueden probar que están cumpliendo con las regulaciones y requisitos de los clientes. Las compañías necesitan mejorar y crear ... -
Cycle Time Reduction of a Crystallization Process in a Chemical Plant
(Polytechnic University of Puerto Rico, 2013)Estimates indicate that Diabetes will increase affecting the population worldwide in the future. To mitigate current and future demand, Barceloneta’s Factory 2 needs to improve the active pharmaceutical ingredient (API) ... -
Diseño de Optimización en el Proceso de Diseño en el Área de Moldeo por Inyección
(Polytechnic University of Puerto Rico, 2017)Mediante el uso de la metodología de Lean se reduce el tiempo de diseño y al mismo tiempo se eleva la calidad de producto que se hace en los moldes de inyección. Este método se aplicará haciendo una implementación de ... -
Diseño de un Sistema Automatizado de Lotes para una Fábrica de Productos de Consumo
(Polytechnic University of Puerto Rico, 2013)Una fábrica de jugos tenía un área de oportunidad relacionada a la falta de abasto a la demanda debido a la poca capacidad de manufacturar jugos a grandes escala. Este proyecto tiene como objetivo reducir el tiempo ... -
Equipment Validation Standardization for Project Implementation Time Reduction of Automated Manufacturing Platforms
(Polytechnic University of Puerto Rico, 2012)Abstract - Medical Device regulated industry requires extensive validation work. Using the latest automation technology for the process equipment to eliminate the operator interaction brings the challenge of how fast the ... -
Estructura para Reconciliación de Lotes en Área de Encapsulación Utilizando la Metodología Esbelta (“Lean”)
(Polytechnic University of Puerto Rico, 2021)La industria farmacéutica ha enfrentado muchos cambios con el paso del tiempo. La necesidad de adaptarse a estos cambios ha provocado que las farmacéuticas hayan tenido que adoptar diferentes metodologías para mantener la ... -
Evaluation to Sleeves Used in Granulation Department for the Graduate Programs at Polytechnic University of Puerto Rico
(Polytechnic University of Puerto Rico, 2021)The DMAIC methodology was applied to analyze a manufacturing system at Johnson & Johnson Pharmaceuticalsin Las Piedras, Puerto Rico. The methodology was used to improve the time for changing and ... -
Feasibility Study of Proposed Manufacturing Layout Re-design to Improve Process Capacity and Reduce Cycle Time of a Downstream Operation of Product A
(Polytechnic University of Puerto Rico, 2022)Lean Six Sigma tools and methodologies are widely used in today’s work environments. The use of a Lean Six Sigma approach provides organizations more flexibility and efficiency to improve their competitiveness. At the ... -
Implementación de Nexgen-PTS y M9 Series para el Mejoramiento y Eficiencia en los Resultados de Control de Calidad
(Polytechnic University of Puerto Rico, 2021)El tiempo y el ahorro monetario es una herramienta sumamente importante en la industria biomédica. Esto nos lleva a estar en constante innovación con el fin de mejoras continuas. El objetivo de este proyecto es reducir la ... -
Implementation of Lean Methodologies in the Small Radiology Firm Bayamón Radiology Center
(Polytechnic University of Puerto Rico, 2019)The Lean methodology was used to reduce examination cycle and lead times for the radiology clinic Bayamon Radiology Center. They clinic had a conventional X-ray system that uses x-ray films. Voice of the Customer and ... -
Improve HTS and Schedule B Classification Process to Reduce the Turnaround Time in a Commodity Shipments Compliance Project
(Polytechnic University of Puerto Rico, 2022)The HTS and Schedule B classification process adds two days to the turnaround time of the standard process of the Commodity Shipments Compliance team. Throughout 2021, 108 of 326 requests approvals, requiring HTS ... -
Improve the Cycle Time of Stat Testing in Quality Control Laboratory Applying Kaizen Analysis
(Polytechnic University of Puerto Rico, 2013)Quality Control Laboratory of Biopharma Company was selected for develop a design project, using the technique of Kaizen Project. Manufacturing area of Biotech Company produces a biological product. Biologic Bulk ... -
Improvement of Order-Processing Process at a Pharmacy
(Polytechnic University of Puerto Rico, 2020)This project explored an improvement in the time that pharmacy employees took to find medicines from the back of the pharmacy. The Six Sigma´s DMAIC method (Define, Measure, Improve, Analyze and Control) was employed ... -
Improving the flow of Sampling Analysis of Manufacturing Batches to reduce time and Increase the Capacity of the Process
(Polytechnic University of Puerto Rico, 2022)This research will focus on analyzing the flow of sample analysis of manufacturing batches to reduce time and increase the capacity of the process in the laboratories. A laboratory in the pharmaceutical industry receives ... -
In-Process pharmaceutical manufacturing aqueous coating suspension hold time study
(Polytechnic University of Puerto Rico, 2018)A hold time study is established in the development phase of any product. All the InProcess unit operations require a hold time study to protect the integrity and quality of the final drug product. This study will analyze ...